Glenn Rd / Flinders Highway Acceleration Lane

Awesome Image

  • Client:
    Roadtek
  • Date:
    August 2020
  • budget:
    $20,000
  • location:
    NY, USA
  • surface:
    1200 ft2
  • architect:
    Farhan rizvi

Project description:

CAMM Quarries supplied over 18,000t of DTMR spec Class A Fill, Bedding Sand and 2.1OMC (Pugged) on this project. The project required materials to be supplied in a tight timeframe with daily delivery volumes critical to the clients success. The team at CAMM Quarries were able to exceed daily delivery requirements and supplied up to 1500-2000t per day. CAMM were also able to provide a delivered solution where B Double Side Tippers were utilised to work with the clients TMP, achieve volume requirements and deliver materials safely once onsite.