TCC Stuart Landfill Cell 3A

Awesome Image

  • Client:
    Aber limited
  • Date:
    25th jan, 2016
  • budget:
    $20,000
  • location:
    NY, USA
  • surface:
    1200 ft2
  • architect:
    Farhan rizvi

Project description:

The aim of the project at The Stuart Landfill is to provide the facility with additional landfill capacity to meet the needs of the city. Throughout construction a total of 39,000t of ‘Clay Rich’ fill material will be imported to site and used to construct a 300mm thick floor and 3.5m high perimeter bunds to the new Cell 3A. CAMM Quarries has delivered the following products to the Stuart Waste Facility. • -75 Select Fill • Screened Clay Fill • Drainage Aggregate • Ballast Rock • Gabion Rock • 2.3 Roadbase • 2.1 Roadbase